Alliance 54th St. Gym

Education

Two-Story Gymnasium & Classroom Building with Subterranean Parking

Two-Story Gymnasium & Classroom Building with Subterranean Parking

20,000 SF

Square Footage

$18M

Project Value

2026 (In Construction Administration)

Completion Year

Los Angeles

Location

Project Scope & Engineering Execution

RES & Associates was commissioned to provide full MEP engineering for a new 20,000-square-foot, two-story gymnasium and classroom building over a subterranean parking garage. Three distinct environments — a high-bay athletic volume, instructional classrooms, and an enclosed below-grade garage — each carried their own load profiles, code requirements, and ventilation demands.

Our electrical design addressed high-bay sports lighting and controls, classroom power and lighting, garage lighting with emergency egress coverage, and the main service and distribution serving the $18M facility. Mechanical engineering handled gymnasium ventilation and classroom zoning alongside mechanically assisted garage exhaust, and plumbing design served locker, restroom, and drainage requirements including below-grade conditions.

‍

Disciplines Involved

High-Bay Sports Lighting & Control Systems

Main Service & Building Power Distribution

Subterranean Garage Exhaust & Ventilation

Emergency Egress Lighting & Life Safety

Below-Grade Plumbing & Drainage Engineering

Project Gallery

No items found.

Get In Touch

Want to Learn More? Ready
to Work Together?

Contact us for all your MEP needs!

Please Note: RES & Associates operates off of an appointmenet only basis
for meetings.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.